RSK-009 — Power or cooling failure in a data centre

History

What is live now, and every settled version, newest first.

Version 1

Settled on This version cannot be attributed to anyone. The first recorded version.

Description

The colocation providers supply power and cooling to the racks, with redundant feeds and generators. A failure beyond what they cover would stop the equipment in one suite for as long as the repair takes.

Measures

Accepted because the providers already carry redundant power and cooling, and a third site would cost more than the loss that an outage of one suite causes. The platform team reads the maintenance and test reports of the providers every year.

Accepted at
2026-05-30
Category
Operational
Closed at
no value
Code
RSK-009
Identified at
2025-11-01
Inherent impact
4
Inherent likelihood
2
Residual impact
4
Residual likelihood
2
Status
Accepted
Title
Power or cooling failure in a data centre